The PSM GmbH in Schiffweiler

News about PSM and our state-of-the-art aseptic contract manufacturing services including fill & finish and secondary packaging

News and announcements from PSM GmbH and the individual company divisions. As a customer, you are always in focus and we will provide you with a behind-the-scenes look.

Read interesting newspaper articles or view our construction documentation.


news / dokumentation

Part 3: The filling line is installed

The highly flexible filling line from groninger for syringes, vials or cylindrical ampoules with an annual capacity of approx. 30 … weiterlesen …

news / video

Part 2: The control cabinets for the filling line are installed with a crane

An exciting day at PSM GmbH, the switch cabinets are inserted by crane over the roof through the window. The … weiterlesen …

news / dokumentation

Construction dokumentation 12-08-2022

The hall for GMP secondary packaging is being built. This is where the quarantine storage, as well as the visual … weiterlesen …

news / video

PSM GmbH at groninger for the FAT – RoboCell

The PSM GmbH was in Crailsheim at groninger Group for the Factory Acceptance Test (FAT) for the RoboCell.

news / video

The first filling line from groninger is delivered to PSM

The first high flexible fill&finish line for syringes, cartridges and vials with an annual capacity of around 30 Mio. containers…

news / video

ISPE D/A/CH workshop at groninger

Shaping the future on robotic gloveless aseptic Filling with the ISPE D/A/CH – Germany, Austria, Switzerland

news / video

FAT at SKAN in Switzerland

The PSM GmbH was in Basel at SKAN AG for the Factory Acceptance Test (FAT).

news / video

PSM visits groninger in Crailsheim

PSM GmbH is visiting groninger & co. gmbh in Crailsheim. We are very excited about the new aseptic filling line … weiterlesen …

news / dokumentation

Construction dokumentation 26-04-2022

From a bird’s eye view, the pharmaceutical campus in Schiffweiler is clearly visible. Our roads are paved and we are … weiterlesen …

news / dokumentation

Construction dokumentation 16-12-2021

Our production is already equipped with a floor covering and finished. We are pleased that the laboratory has now also … weiterlesen …